24/7 EMERGENCY SERVICE — (206) 774-1400
SERVING THE PUGET SOUND SINCE 1979
EVERGREENPower Systems Inc.
Advanced systems

EV Charging Infrastructure

Charging built for the fleet you'll have in ten years.

The hard part of EV charging isn’t the charger — it’s the power behind it. We start with a load study and a service-capacity review, then design infrastructure that supports the chargers you need today and the conduit pathways for the ones you’ll add later, so you trench once instead of three times.

What we deliver

  • Level 2 and DC fast-charging installations
  • Fleet electrification planning and phased buildouts
  • Load studies, service upgrades, and utility coordination
  • Load-management systems that avoid oversized services
  • Workplace and multifamily charging programs

Power problem right now?

Our emergency line is answered around the clock, every day of the year.

(206) 774-1400